Blog

Using Your Own Modem With Comcast

With all of the drama happening with Comcast starting to use home routers as public access points for their customers I thought it would be helpful to put a post together about how to use your own modem and router with your Comcast connection. I have had my own hardware doing this for awhile and not only does it give you better security from things Comcast wants to do, but gives you much better control and speeds.

Motorola SurfBoard SB6141The first thing you need is a modem. Some of these come with routers/wifi access points built in, but I prefer to use a stand alone modem so I can upgrade my gear piece by piece when I need to. My current modem is a Motorola Surfboard SB6141. Its a DOCSIS 3.0 modem which can handle up to 343Mbps down and 131Mbps. Until we get fiber into the home this should suffice. When you get this you will have to give Comcast a call to have them activate it on your network. It’s about a 10 minute phone call and they should do it no problem. If you currently have a device that you are renting from Comcast you can get that ready to go back to them. They will activate the modem and from there we are done with them.

Next you will need your router. I use an Apple Airport Extreme. I love these for how simple they are. You don’t get all the customization that you might from a Linksys or D-Link, but I just want something simple that I don’t have to maintain. All you do is use an ethernet cable from the Motorola to the WAN port on the Airport Extreme and then hop on your phone or computer to use Airport Utility to configure the router how you like. Setting that up is an entirely other post that may come soon.90mm

Thats the whole of it. It really is pretty simple to get out from under Comcast’s thumb and use your own gear. Please leave any questions or comments below and I will answer what I can.

2016-12-13T20:06:35-08:00June 19th, 2014|Categories: Blog|Tags: , , , , , , , |1 Comment

Handmade Wood & Pipe Modern Industrial Desk Video

This is a tour of my handmade wood and pipe modern industrial desk. Links will follow below for some of the items I used. Please leave comments below with any questions.

SIGNUM Cable management
DIODER LED 4-piece light strip set
Blue Microphones Yeti USB Microphone
Blue Microphones The Pop Universal Pop Filter
Blue Microphones Yeti and Yeti Pro Custom Spider Shock Mount
RODE PSA1 Swivel Mount Studio Microphone Boom Arm
Apple iMac with Retina 5K display
Drobo USB 3.0 4-Bay Storage Array (DDR3A21)
Razer Naga MMO Gaming Mouse
Razer Vespula Dual-Sided Gaming Mouse Mat – Speed and Control
Razer Kraken PRO Over Ear PC and Music Headset – Black
Epson Expression XP-410 Wireless Color All-in-One Inkjet Printer
Apple Magic Mouse
Apple Magic Trackpad
Twelve South MagicWand for Mac | Connects Magic Trackpad to Apple Wireless Keyboard

2016-12-13T20:23:08-08:00June 8th, 2014|Categories: Blog|Tags: , , , , |0 Comments

New Blue Mic

Since starting all this podcasting I have really been wanting to get a new mic.  I have been using the mic on my for now and it works alright, but stepping up to the Blue Yeti should make a big difference. My order just processed this morning so hopefully by the end of the week I’ll have it and can start the podcast with much better audio.

IMG_0787

2026-06-17T08:00:12-07:00May 20th, 2014|Categories: Blog|Tags: , , , |0 Comments

My New ESO Addon Manager

If theres one thing I like more than playing video games, its customizing the way they look. I love setting up and getting new add-ons for them.  I probably have 40 all setup in WOW and was starting to get a good amount for ESO. For WOW I use Wow Matrix to keep them all updated and just found out about Minion for ESO. I really like this add-on manager and when they add the ability to manage them for WOW I’ll probably dump Wow Matrix.

2014-05-20T00:56:27-07:00March 13th, 2014|Categories: Blog|Tags: , , , |2 Comments

My New Hand Built Modern Industrial Desk

Over the past week or so my dad and I started putting together a new desk for my office. I had wanted a new one for awhile but was unhappy with anything I was finding in stores or online.  I found some ideas for the galvanized pipe as the legs and then talked with my dad on how to make the desktops. It only took us about 2 days of work and then some time for the stain and finish to dry. Leave a comment if you have any questions.

2015-05-02T13:04:26-07:00March 6th, 2014|Categories: Blog|Tags: , |2 Comments